Brief Description:This project was to construct an extension to the school to allow for the installation of a new lift. The scope included construction of a new entrance ramp and canopy, alterations to the ground, first and second floor classrooms and refurbishment of existing toilet facilities.
The project was carried out during term time as well as some out of term time works. Our team worked and communicated effectively in this scenerio without incident or injury to all. Client: Essex County Council
Client Contact: Gerald Daniel Consultant: WS Atkins Project: Mayflower High School, Billericay, Essex Works: Extension, new lift installation, DDA alterations and classroom alterations Contract Duration: 12 weeks Contract Sum: £225,000 The Programme:The project commenced in May 2008 and completed September 2008 in readiness for the new school term.
Despite long lead in periods and design issues for the lift installation, the project was a huge success and the school reopened ready for term on time. Design & Innovation: The design criteria was to keep the new works in keeping with the existing building. This was achieved by matching materials and colours in the new finishes and structure as close as possible.
The lift design, due to space and levels, caused some initial complications, however these were overcome in collaboration with WS Atkins and Kone and accommodated into the programme. What Our Clients Say: We are extremley pleased with the works undertaken by CG Interiors at our school, they worked efficiently and proactively throughout the whole process.
|