Click on the slide!

857 London Road

Case Studies >> CG Interiors

Project Name

This waste land site was acquired in July 2007 with the possibility of planning a new build office and warehouse construction. We assisted the clients in obtaining planning permission and with appointment of the lead architect.

Click on the slide!

38 Finsbury Square

Case Studies >> CG Interiors

Project Name

CG Interiors were originally commissioned to carry out the soft strip demolitions and builders work on the existing building. Additional work packages included: - roofing, flooring, new internal block work walls, suspended ceilings, plastering, painting and decorating, structural openings for a new lift installation and new services including the renewal of major plant on the roof were also undertaken.

Click on the slide!

Mayflower

Case Studies >> CG Interiors

Project Name

This project was to construct an extension to the school to allow for the installation of a new lift. The scope included construction of a new entrance ramp and canopy, alterations to the ground, first and second floor classrooms and refurbishment of existing toilet facilities.

Click on the slide!

Guys Roman Suite

Case Studies >> CG Interiors

This project was competitively tendered over Christmas 2007 and with a return date of 27th December 2007. The Contract was awarded on the 2nd January 2008 with an immediate start.

Click on the slide!

Billericay Police Station

Case Studies >> CG Interiors

Project Name

Billericay Police Station was converted by CG Interiors to conform to the Disability Discrimination Act. We removed the existing ramp, front entrance steps, entrance doors and public counter. We converted the existing office, formed a new disabled toilet facility along with other internal office alterations to assist disabled persons accessibility.

Frontpage Slideshow (version 2.0.0) - Copyright © 2006-2008 by JoomlaWorks
Tunbridge Wells Adult Education Centre

scaffolding to rear elevation erected
Brief Description:The scope of the project was to undertake repairs to front elevation stonework, secondary glazing fire protection adjacent fire escape, removal and infill of pavement lights, roof repairs and lead replacement.

The contract period was for 6 weeks. With a start date of mid June 2011 and a completion date of end of July 2011. During the course of the works, the Adult Education Centre remained open and available to staff and the public with limited disturbance.

completed dormer with exception of tiling
fascia detail decorated
Client:Kent County Council


Project: Tunbridge Wells Adult Education Centre


Works: Repairs to front elevation stonework, secondary glazing fire protection adjacent fire escape, removal and infill of pavement lights, roof repairs and lead replacement


Contract Duration: 6 weeks


Contract Sum: £61,000

new stonework repair to coping stone lhs
front head of dormer from underside
The Programme:We successfully completed the works in the given time frame without problems or interruptions. With the success of this project at Tunbridge Wells Adult Education Centre, CG Interiors then won a further project for variations works to the site, expected to commence November 2011.

CG Interiors Ltd has developed a strong relationship with Kent County Council and continues to carry out various works due to the success of previous contracts completed.

 

Head Office

857 London Road
West Thurrock
Grays
Essex
RM20 3AT

Map & Directions

Contact Details

Tel: 0845 873 8833
Fax: 0845 873 8834
Email: sales@cg-group.co.uk

outperformance as standard

Cre8ive Imagery

Disclaimer

Whilst the CG Group of companies, including Cranegates Limited and CG Interiors Ltd make every effort to keep the information on this web-site accurate, they disclaim any warranty or representation, express or implied about its accuracy, completeness or appropriateness for particular purpose.

Thus, you assume full responsibility for using the information on this web-site, and you understand and agree that neither the CG Group nor any of their employees are responsible or liable for any claim, loss or damage resulting from its use.

Privacy Policy

We operate in accordance with the 1998 Data protection act in respect of any personal information you may supply, e.g. name, address, e-mail, etc.. We will not sell or supply any information you provide to third parties. If you are a user with general public and anonymous access, the CG Group Web Site (www.cg-group.co.uk) does not store or capture personal information, but merely logs your IP address which is automatically recognised by the web server. This statement only covers the CG Group Web Site maintained by CG Group. This statement does not cover other websites linked to from within this site. The system will record your e-mail address and other information if volunteered to us by you. This shall be treated as proprietary and confidential and will only be used to provide the services you have specifically signed up for. By subscribing to these services, you are giving your consent to CG Group to hold this information.

{component}option=com_xmap&sitemap=1&Itemid=22{/component}