Click on the slide!

Billericay Police Station

Case Studies >> CG Interiors

Project Name

Billericay Police Station was converted by CG Interiors to conform to the Disability Discrimination Act. We removed the existing ramp, front entrance steps, entrance doors and public counter. We converted the existing office, formed a new disabled toilet facility along with other internal office alterations to assist disabled persons accessibility.

Click on the slide!

Mayflower

Case Studies >> CG Interiors

Project Name

This project was to construct an extension to the school to allow for the installation of a new lift. The scope included construction of a new entrance ramp and canopy, alterations to the ground, first and second floor classrooms and refurbishment of existing toilet facilities.

Click on the slide!

Guys Roman Suite

Case Studies >> CG Interiors

This project was competitively tendered over Christmas 2007 and with a return date of 27th December 2007. The Contract was awarded on the 2nd January 2008 with an immediate start.

Click on the slide!

857 London Road

Case Studies >> CG Interiors

Project Name

This waste land site was acquired in July 2007 with the possibility of planning a new build office and warehouse construction. We assisted the clients in obtaining planning permission and with appointment of the lead architect.

Click on the slide!

38 Finsbury Square

Case Studies >> CG Interiors

Project Name

CG Interiors were originally commissioned to carry out the soft strip demolitions and builders work on the existing building. Additional work packages included: - roofing, flooring, new internal block work walls, suspended ceilings, plastering, painting and decorating, structural openings for a new lift installation and new services including the renewal of major plant on the roof were also undertaken.

Frontpage Slideshow (version 2.0.0) - Copyright © 2006-2008 by JoomlaWorks
Schools

1
Client: Mouchel
Client Contact: Lucy Goldsmith
Project: Kings Langley School, Kings Langley
Contract Duration: 8 weeks
Contract Sum: £160,000
Brief Description:The works consisted of the complex removal of asbestos insulation board used as window infill panels to 3 levels of Block D. Work enclosures were constructed within classrooms, corridors and office areas. So the asbestos could be removed under fully controlled conditions to assist with the construction of the work enclosure sections of non asbestos MMMF/Plaster ceilings had to be carefully removed, this allowed for a full airtight seal of the enclosure and prevention of any potential cross contamination of the ceiling void.

On completion of the removal works the ceilings were reinstated to match existing and temporary plywood was installed into the window infills.
3
Client: May Gurney Ltd
Client Contact: Steven Revell
Project: Willowbrook Primary School, Brentwood
Works: Asbestos residue removal
Contract Duration: 3 weeks
Contract Sum: £25,000
Brief Description:The works consisted of the removal of asbestos insulation board debris located within the floor ducts on the ground floor of the Infant Block and asbestos insulation board ceiling tiles within various rooms. Works within the Infant Block were carried out whilst the Primary School was fully functional. Hoarding were constructed around the Infant Block causing minimum disruption to the Primary School, this in turn allowed the project to run swiftly and on program.

Within the program period our team of surveyors assist the independent analytical consultant for additional investigation works/intrusive survey.
2
Client: London Borough of Lambeth
Client Contact: Gary Morris
Project: Norwood School SE19
Works: Asbestos residue removal
Contract Duration: 8 weeks
Contract Sum: £272,000
Brief Description: The works consisted of the removal of asbestos residue beneath the non asbestos MMMF pipe insulation located internally and externally to school within the floor ducts that were covered with concrete and timber covers.

The asbestos removal project was part of a major heating upgrade to the school and was completed in a tight program over two school terms. Phase one of the project was completed whilst the school was fully functional, hoardings were constructed around the access points into the floor ducts causing minimum disruption to the school which allowed the M&E element of the project additional time to complete the works.
4
Client: Mace
Client Contact: Liza Stafford
Project: Sele School, Hertford
Works: Asbestos Removal within Science Labs
Contract Duration: 1 weeks
Contract Sum: £18,000
Brief Description: Asbestos removal works were required to assist with the refurbishment of the Science Labs in the half term period of the school.  The works consisted of the removal of fan convectors with asbestos insulation board, AIB from sky lights and floor tiles throughout the Labs.

 

Essex Office

857 London Road
West Thurrock
Grays
Essex
RM20 3AT

Map & Directions

Sheffield Office

Unit 19
85 Leigh St Ind Est
Sheffield
S9 2PR

Map & Directions

Contact Details

Tel: 0845 873 8833
Fax: 0845 873 8834
Email: sales@cg-group.co.uk

outperformance as standard

Cre8ive Imagery

Disclaimer

Whilst the CG Group of companies, including Cranegates Limited and CG Interiors Ltd make every effort to keep the information on this web-site accurate, they disclaim any warranty or representation, express or implied about its accuracy, completeness or appropriateness for particular purpose.

Thus, you assume full responsibility for using the information on this web-site, and you understand and agree that neither the CG Group nor any of their employees are responsible or liable for any claim, loss or damage resulting from its use.

Privacy Policy

We operate in accordance with the 1998 Data protection act in respect of any personal information you may supply, e.g. name, address, e-mail, etc.. We will not sell or supply any information you provide to third parties. If you are a user with general public and anonymous access, the CG Group Web Site (www.cg-group.co.uk) does not store or capture personal information, but merely logs your IP address which is automatically recognised by the web server. This statement only covers the CG Group Web Site maintained by CG Group. This statement does not cover other websites linked to from within this site. The system will record your e-mail address and other information if volunteered to us by you. This shall be treated as proprietary and confidential and will only be used to provide the services you have specifically signed up for. By subscribing to these services, you are giving your consent to CG Group to hold this information.

{component}option=com_xmap&sitemap=1&Itemid=22{/component}